In the following article we will explain the advantages of absolute analysis for wind farm life extension by detailing one of the latest absolute analyses we have performed on a 1.5 MW wind turbine hub.
continue reading
In the following article we will explain the advantages of absolute analysis for wind farm life extension by detailing one of the latest absolute analyses we have performed on a 1.5 MW wind turbine hub.
continue reading
In this article, we are going to analyze a specific case study on the detailed analysis of the structural effects of a WSM strategy and the development of new WSM...
continue reading
Last week we headed up to Minneapolis (MN) to attend CLEAN POWER 2024, a conference and exhibition encounter hosted by the American Clean Power...
continue reading
Nabla Wind Hub attended for the second year the Wind Europe international wind fair, one of the main annual events in the wind energy sector.
continue reading
Nabla Wind Hub and SGS were pioneers in certifying the first 40-year wind farm in the world. It was a job that was done independently because there was not yet an IEC61400-28 standard that would bring the wind industry into agreement on how different levels of analysis for life extension were considered good.
continue reading
Since last year, Nabla Wind Hub has been collaborating with the Japanese country through the Fukushima Renewable Energy Institute (FREA), and the National Institute of Advanced Industrial Science and Technology (AIST),offering they know-how and expertise on the latest trends in O&M technology and wind farm life extension.
continue reading