Today, we encounter a number of components that, due to inadequate design, suffer structural problems before the 20 year period. An example of such, is the rear frame of some 2.0 MW platforms.
continue reading
Today, we encounter a number of components that, due to inadequate design, suffer structural problems before the 20 year period. An example of such, is the rear frame of some 2.0 MW platforms.
continue reading
In a wind farm located in Greece, a complex site characterized by extremely high turbulences, recurrent failures were experienced in the turbine blades leading to blade breakage.
continue reading
In the following article we will explain the advantages of absolute analysis for wind farm life extension by detailing one of the latest absolute analyses we have performed on a 1.5 MW wind turbine hub.
continue reading
In this article, we are going to analyze a specific case study on the detailed analysis of the structural effects of a WSM strategy and the development of new WSM...
continue reading
The Aluminum Rings (Aluring) crack propagation is one of the most common problems related to wind turbine blades internationally (more specifically on V4X and G47), in countries that were early adopters of wind power technology.
continue reading